Glidepath Solutions

EVcapture survey

Built for on-site use. Add quantities, notes, and item-linked photos directly from your phone.

13 survey itemsCapture per-item photos
0 photos addedAll linked into the PDF and CSV

1. Site details

Start the survey

Complete the project details first. Everything below is designed for quick thumb use on site.

2. Survey items

Complete each line item

Add a quantity, note, photos, or any combination. Smaller screens stay in card mode for easier tapping.

Civils
Civils

Site Survey

0 photos

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

NIE attendance

0 photos

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Installation of Feeder Pillar Bases

0 photos

Excavate through existing footway for new feeder pillar bases dispose of site; form conc insitu base 1650mm (l) x 600mm (w) x 300mm (d); on 150mm Type 1 base; 50mm blinding; backfill and leave good; fit new feeder pillar to base (Feeder Pillar supplied free issue by weev).

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Construction of NAL Retention Socket Bases

0 photos

Installation of Retention socket base RS115 (supplied free issue by weev); excavate foundation 850 x 850mm to depth of 600mm; insitu ST4/C20 concrete laid on 50mm blinding; backfill and leave good.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Installation of Ratio EV Chargers

0 photos

Installation of Ratio io7 Charger units; 1414 height as per spec (supplied free issue by weev) including adaptor plate install; excludes electrical cabling and connections.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Installation of sign post

0 photos

Installation of sign post (free issue by weev) including excavation, concrete surround, backfill and make good.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Trackwork & Duct Installation

0 photos

Excavate through existing footway 600mm depth for new cable duct; dispose off site; lay 100mm cable duct on 50mm fine sand bed and surround on 350mm type 1 fill; 80mm base course; 30mm wearing course.

Notes guidance: 1) 17nr Double Units (2 charging bay requirements) allowed 15m length each. 2) 93 nr Single units (1 charging bay requirement) allowed 10m length each.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

NIE Ductwork from Feeder Pillar to joint pit

0 photos

Excavate through existing footway 600mm depth for new cable duct; dispose off site; lay 100mm cable duct on 50mm fine sand bed and surround on 350mm type 1 fill; 80mm base course; 30mm wearing course.

Notes guidance: 5m length allowance from feeder pillar to joint pit.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Installation of Earth Spike

0 photos

Installation of Earth spike and cabling from feeder pillar to spike (allow 1 spike, 1 inspection chamber and 10m of 16mm earth).

Notes guidance: 10m length, 1 spike and 1 inspection chamber.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Line Marking to EV Parking Bays

0 photos

Line Marking As per Weev Layout.

Notes guidance: Budget / PC Sum Rate Carried.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Civils

Traffic Management

0 photos

TM - Allowance per charging location.

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Other items noted
Other items noted

Install Marketing Pole

0 photos

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

Other items noted

150mm Core into concrete

0 photos

Section photos

Capture from camera or choose from gallery. These photos will be linked to this survey item.

3. General photos

Add site-wide photos

Use this for overall location context. Item-specific evidence should go on the relevant survey card above.

General site photos

Up to 8 photos total across the whole form, 8MB each.