CivilsSite Survey0 photosQuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsNIE attendance0 photosQuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsInstallation of Feeder Pillar Bases0 photosExcavate through existing footway for new feeder pillar bases dispose of site; form conc insitu base 1650mm (l) x 600mm (w) x 300mm (d); on 150mm Type 1 base; 50mm blinding; backfill and leave good; fit new feeder pillar to base (Feeder Pillar supplied free issue by weev).QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsConstruction of NAL Retention Socket Bases0 photosInstallation of Retention socket base RS115 (supplied free issue by weev); excavate foundation 850 x 850mm to depth of 600mm; insitu ST4/C20 concrete laid on 50mm blinding; backfill and leave good.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsInstallation of Ratio EV Chargers0 photosInstallation of Ratio io7 Charger units; 1414 height as per spec (supplied free issue by weev) including adaptor plate install; excludes electrical cabling and connections.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsInstallation of sign post0 photosInstallation of sign post (free issue by weev) including excavation, concrete surround, backfill and make good.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsTrackwork & Duct Installation0 photosExcavate through existing footway 600mm depth for new cable duct; dispose off site; lay 100mm cable duct on 50mm fine sand bed and surround on 350mm type 1 fill; 80mm base course; 30mm wearing course.Notes guidance: 1) 17nr Double Units (2 charging bay requirements) allowed 15m length each. 2) 93 nr Single units (1 charging bay requirement) allowed 10m length each.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsNIE Ductwork from Feeder Pillar to joint pit0 photosExcavate through existing footway 600mm depth for new cable duct; dispose off site; lay 100mm cable duct on 50mm fine sand bed and surround on 350mm type 1 fill; 80mm base course; 30mm wearing course.Notes guidance: 5m length allowance from feeder pillar to joint pit.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsInstallation of Earth Spike0 photosInstallation of Earth spike and cabling from feeder pillar to spike (allow 1 spike, 1 inspection chamber and 10m of 16mm earth).Notes guidance: 10m length, 1 spike and 1 inspection chamber.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsLine Marking to EV Parking Bays0 photosLine Marking As per Weev Layout.Notes guidance: Budget / PC Sum Rate Carried.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
CivilsTraffic Management0 photosTM - Allowance per charging location.QuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
Other items notedInstall Marketing Pole0 photosQuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos
Other items noted150mm Core into concrete0 photosQuantityNotesSection photosCapture from camera or choose from gallery. These photos will be linked to this survey item.Add photos